India’s EV Data Platform — Updated May 2026

Stop Guessing.
Start Calculating. The Hard Math of India’s EV Transition.

Brutally honest financial models and real-world engineering teardowns. We don’t review cars — we audit their 5-year Total Cost of Ownership (TCO). No marketing. No fluff. Just the numbers that actually matter.

₹1.2L Avg. Savings/yr
3.4yr Breakeven Avg.
700+ Teardowns
5yr TCO Model
Updated monthly with live fuel & electricity rates
Browse Teardowns →
Chennai, India
CEA Grid Factor: 0.716 kg CO₂/kWh
TANGEDCO Rate: ₹9.10/kWh (501+ units)
Data: May 2026
Run Calculator
Market Intelligence · Tamil Nadu

The 2026 EV Market Index

Every number audited. No manufacturer copy. 40 km/day Chennai commute baseline.

Live TANGEDCO & Fuel Rates
Petrol ₹100.84/L  ·  EV ₹9.10/kWh  ·  Updated monthly
Vehicle
ARAI
Real Range
₹/km
5-Year Break-Even
5-Yr Saving
Audit
Vehicle
ARAI
Real Range
₹/km
5-Yr Break-Even
5-Yr Saving
Audit
Section 5 · Infrastructure Intelligence

The Hidden Costs:
Grid Penalties & Infrastructure

TANGEDCO's slab structure, load sanctions, and charger wiring can add ₹40,000–₹1.2L to your real EV cost. Here's what no dealer will tell you.

Audit Before You Buy
The Penalty

The TANGEDCO
500-Unit Trap

Charging at home pushes most households past the 500-unit threshold. TANGEDCO then retroactively applies the higher slab rate to every unit — not just the excess.

Slab jump: ₹5.00 → ₹9.10 per unit. Cross 500 units with EV charging and your entire bill gets re-rated. That's a ₹2,000+ surprise on one bill.

Read the Slab Teardown
Slab 1 — 0–100 units
₹2.35 / unit
Slab 2 — 101–200 units
₹4.00 / unit
Slab 3 — 201–500 units
₹5.00 / unit
Slab 4 — 501+ units
₹9.10 / unit EV Risk
Avg. EV draw (40 km/day)
~180 units/mo
TN Govt. free units (domestic)
200 FREE 2026
The Offset

PM Surya Ghar:
The Real Numbers

A 3kW rooftop solar system eliminates the slab penalty while generating free EV kilometres from the sun.

Grid units offset by solar 74%
Bill reduction after subsidy 68%
Calculate ROI
PM Surya Ghar subsidy (3kW)
₹78,000 Centre
TN TEDA state top-up
₹18,000 State
Net cost after subsidy ~₹54,000
Payback (with EV charging) 3.2 yrs
Hardware
₹37K
Max install budget
7.4kW Charger:
Real Install Cost

TANGEDCO load sanction, 6mm² wiring, earthing, MCB — costs no EV ad mentions.

Charger unit (Type 2) ₹8K–₹18K
Wiring + MCB + earthing ₹7K–₹14K
TANGEDCO sanction fee ₹2K–₹5K
Sanction wait time (Chennai) 4–8 wks
Shop 7.4kW chargers →
Action Plan
4
Steps before you buy
Infrastructure
Audit Checklist

Most EV buyers skip the infra audit and face ₹40K+ in surprises by month two.

Check current slab usage Step 1
Apply for load sanction Step 2
Get solar + charger quotes Step 3
Run full TCO calculator Step 4
Open TCO Calculator →
Run Your Full Infrastructure Audit
Before Signing the Purchase Order

Our free calculator factors in TANGEDCO slabs, solar offset, charger install, and real km cost — all in one number.

TANGEDCO Tariff FY 2025–26
PM Surya Ghar Phase II rates
Chennai contractor quotes Apr 2026
TN Govt. 200 free units · 2026
Charger links = Amazon Associates affiliate links.
Only independently verified products listed.